Ground leveled and dead trees removed

Kevin and his buldozer leveled the ground around the house, removed the dead apple trees, and graveled the driveway.
This is where the new water pressure pump (for the city water flowing to the house) will go.
This is the trench where the pipe will be placed connecting the water pressure pump to the main city line.

Loading